RTK-1001_a.JPG

How to Install the Allison 1000 C1 Torqkit 1999-UP

view all articles
January 9, 2019

Part No: RTK-1001

Components:

  • 8 pcs SS OD Splined Friction
  • 8 pcs SS ID Splined Friction
  • 1 Thick Apply Plate (5-speed)
  • 1 Thin Apply Plate (6-speed)

Installation Instructions

Early 5-speed units:

1. Install the thick apply plate for optimum load distribution.

Caution: DO NOT USE THE THIN APPLY PLATE IN THE 5-SPEED UNIT.

2. Install 1 SS ID splined friction plate with friction material facing up toward you.

3. Install 1 SS OD splined friction plate with friction material facing up toward you.

4. Continue alternating SS ID splined friction plates and SS OD splined friction plates until 7 of the ID splined plates and 7 of the OD splined plates are installed.

5. Install the OE backing plate, followed by the (OE) snap ring.

Late 6-speed units:

1. Install the thin apply plate for optimum load distribution.

Caution: DO NOT USE THE THICK APPLY PLATE IN THE 6 SPEED UNIT.

2. Install 1 SS ID splined friction plate with friction material facing up toward you.

3. Install 1 SS OD splined friction plate with friction material facing up toward you.

4. Continue alternating SS ID splined friction plates and SS OD splined friction plates until all 8 of the ID splined plates and all 8 of the OD splined plates are installed.

5. Install the OE backing plate, followed by the (OE) snap ring.

posted by: Nathan Truncone   comments: 0

Where To Buy

  • Search By State
  • Search By Country